Island rebuilding after the storm
Estero Island took the brunt of Hurricane Ian, and the town is in a long rebuild of raised homes, restaurants and Times Square businesses that all need restrooms on site through demolition and reconstruction.
We stage a flushing unit and a handwashing station at the base of a lift-and-rebuild and keep it on a steady route, adding service when a big crew is pouring pilings or setting a new elevated shell.
Because a raised rebuild can run a year or more, we settle a standing route up front so the unit is pumped and restocked on schedule without a call every week.
Getting onto the island
Everything crosses the Matanzas Pass Bridge onto a narrow island with limited parking and tight lots, so we schedule a delivery window and place units where a service truck can pull in without blocking Estero Boulevard.
On the loose beach sand we set units on boards or a firm pad back from the tide line so they stay level and the driver keeps solid footing.
Where a lot has no room to spare, we place the restroom at the front setback and time the service visit for the quiet early hours before the island fills with beach traffic.
Beach weddings and Gulf-front events
Barefoot weddings, beach cleanups and Gulf-front parties fill the season, and a discreet cluster of units with a handwashing station keeps a beach gathering comfortable where no restrooms exist.
For an upscale sunset reception the climate-controlled restroom trailer gives guests a cool, tidy stop after a warm, salty afternoon on the sand.
For a shoreline ceremony we tuck the units behind a dune walkover or a cabana line so they serve the crowd without ever landing in a photo down the beach.
